Winglet being replaced
Winglet replacements are cost-effective, high quality and reliable

Winglet Installation

Our team of engineers and mechanics possess extensive experience of winglet installation on Boeing 737/757/767. Additional to their technical expertise, delivery and testing of the work executed are carried out within agreed downtime and at a fixed cost.

We assist our customers with project planning and implementation from start to end.

Further Information:
+44 (0)7966288724
Further Information:
+44 (0)7966288724

Blended Winglet Installation (Retrofit)

We have a team of engineers and mechanics with a long experience of winglet installation on Boeing 737/757/767.

Winglets installed within a given downtime and at a fixed cost to full completion and testing.

Example of a B737 with retrofit winglets with a down time of 14 days:

  • Strengthening the internal structure of the wings and centre section.
  • Replacing outboard rib.
  • Replacing skin fasteners in skin planks.
  • Fit strengthening links in the leading edges.
  • Installing an additional auto slat actuator.
  • Re-configuring the stab trim position switches.
Winglet Removal
  • Start of winglet removal

  • Wingtip removed

  • Upper and lower skin panel removal

  • Jig and new rib fitting in progress

Fitting and Installation
  • Rib and lower skin fitted

  • Winglet awaiting installation

  • Winglet installation near completion

  • Final work near completion